17. Install the purge joint (A) to the bracket.
12 N m (1.2 k g f m , 8.7 Ibf-ft)
(1.2 kgf-m, 8.7 Ibf-ft)
18. Install the water bypass hose (B), g r o u n d cable (C),
and harness holder m o u n t i n g bolt (D).
19. Install the upper radiator hose (A) and lower
radiator hose (B).
20. Install the intake m a n i f o l d (see page 9-5).
2 1 . After installation, check that all tubes, hoses, and
connectors are installed correctly.
22. Refill the radiator w i t h engine coolant, then bleed
air f r o m the cooling system (see step 8 on page
10-7).
23. Clean up any spilled engine coolant.
10-11