20. Install the EVAP canister hose (A).
*12
21. Install the catalytic converter (see page 11-393).
22. Install the intake manifold (see page 9-5).
23. Install the drive belt (see page 4-31).
24. Install the strut brace (if equipped) (see page
20-287).
25. After installation, check that all tubes, hoses, and
connectors are installed correctly.
26. Inspect for fuel leaks. Turn the ignition switch to
ON (II) (do not operate the starter ) so the fuel pump
runs for about 2 seconds and pressurizes the fuel
line. Repeat this operation three times, then check
for fuel leakage at any point in the fuel line.
27. Refill the radiator with engine coolant, and bleed
air from the cooling system with the heater valve
open (see step 6 on page 10-6).
28. Inspect the idle speed (see page 11-342).
29. Inspect the ignition timing (see page 4-20).

Sealing Bolt Installation

NOTE: When installing the sealing bolt, always use a
new washer.
A
TA08AEIA14600017841KCAT00
22 x 1.5 mm
74 N·m (7.5 kgf·m, 54 lbf·ft)
6-49
6-49
*01