Mitsubishi Electric GT1685 Connection Manual page 482

Got1000 series
Table of Contents

Advertisement

Sequence program
The parameter setting and the sequence program of
the data link startup request is required.
(1) Programming condition (with CC-Link dedicated
instructions)
The program sets the network parameter and
automatic refresh parameter when PLC CPU status
changes from STOP to RUN, and automatically starts
the data link with CC-Link dedicated instructions.
(a) I/O signal of CC-Link module
Control & Communication Link System Master/
Local Module Type AJ61BT11/A1SJ61BT11
User's Manual
(b) Device used by user
Device
M0
RLPA instruction normal completion flag
M1
RLPA instruction error completion flag
M100
Network parameter setting flag
M101
Automatic refresh parameter setting flag
D0
Synchronous mode valid/invalid
D1
Number of connected modules
D2
Station data
D3
Send buffer size
D4
Receive buffer size
D5
Automatic update buffer size
Error code in the case of error completion of
D400
RLPA instruction
D100 to D103
Automatic refresh setting (RX)
D104 to D107
Automatic refresh setting (RY)
D108 to D111
Automatic refresh setting (RW)
D112 to D115
Automatic refresh setting (SB)
D116 to D119
Automatic refresh setting (SW)
13 - 42
13. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
13.4 PLC Side Setting
Application

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents