Precautions - Mitsubishi Electric GT1685 Connection Manual

Got1000 series
Table of Contents

Advertisement

19.7 Precautions

Station number setting of the energy
measuring unit/electronic multi-measuring
instrument
In the system configuration, the energy measuring unit/
electric multi-measuring instrument with the station
number set with the host address must be included. For
details of host address setting, refer to the following.
19.4.1 Setting communication interface
(Communication settings)
GOT clock control
The settings of "time adjusting" or "time broadcast"
made on the GOT will be disabled on the PLC.
Cutting the portion of multiple connection of
the controller
By setting GOT internal device, GOT can cut the
portion of multiple connection of the controller. For
example, the faulty station where a communication
timeout error occurs can be disconnected from
connected equipment. For details of the setting
contents of GOT internal device, refer to the following
manual.
GT Designer3 Version1 Screen Design Manual
19 - 12
19. ENERGY MEASURING UNIT/ELECTRIC MULTI-MEASURING INSTRUMENT CONNECTION
19.7 Precautions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents