Mitsubishi Electric GT1685 Connection Manual page 406

Got1000 series
Table of Contents

Advertisement

(b) Network range assignment
Item
Start
Station
No.1
End
LB
Start
Station
No.2
LB/LW
End
Setting
Start
(1)*1
Station
No.1
End
LW
Start
Station
No.2
End
*1
LB/LW Setting (2)
*1
LX/LY Setting (1)
*1
LX/LY Setting (2)
Reserved Station
Pairing
: Necessary
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the unit parameter
After writing unit parameters to the PLC CPU, turn the
PLC CPU OFF then back ON again, or reset the PLC
CPU.
11 - 12
11. CC-Link IE CONTROLLER NETWORK CONNECTION
11.4 PLC Side Setting
Setting
necessity at
Set value
GOT
connection
0000
H
00FF
H
0100
H
01FF
H
00000
H
000FF
H
00100
H
001FF
H
No Setting
No Setting
No Setting
(Use default value)
: As necessary
: Not necessary
(c) Routing setting
Up to 64 [Target Network No.]s can be set.
However, the same transfer network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 64 kinds of
[Target Network No.]s.
Item
Target Network No.
Relay Network No.
Relay Station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
11.3.3 Routing parameter setting
Range
1 to 239
1 to 239
1 to 120

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents