Mitsubishi Electric GT1685 Connection Manual page 385

Got1000 series
Table of Contents

Advertisement

(b) Routing parameter setting
Up to 64 [Transfer Network No.]s can be set.
However, the same transfer network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 64 kinds of
[Transfer Network No.]s.
Item
Transfer target network No.
Relay network No.
Relay station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
10.3.3 Routing parameter setting
Range
1 to 239
1 to 239
1 to 120
10. MELSECNET/10 CONNECTION (PLC TO PLC NETWORK)
[Controller Setting] of GT Designer3
Item
Retry
Timeout Time
POINT
POINT
POINT
[Controller Setting] of GT Designer3
For the setting method of [Controller Setting] of GT
Designer3, refer to the following.
10.3.1 Setting communication interface
(Communication settings)
Setting of the MELSECNET/10
communication unit
Item
Network number setting switch
Group number setting switch
Station number setting switch
Mode setting switch
POINT
POINT
POINT
Setting of the MELSECNET/10 communication unit
For the setting method of the MELSECNET/10
communication unit, refer to the following.
10.3.1 Setting communication interface
(Communication settings)
10.4 PLC Side Setting
Set value (Use default)
3times
3sec
Set value
1: Network No.1
0: No group setting (fixed)
2: Station No.2
0: Online (fixed)
10 - 17
9
10
11
12
13
14
15
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents