Cc-Link Connection (Intelligent Device Station) - Mitsubishi Electric GT1685 Connection Manual

Got1000 series
Table of Contents

Advertisement

4.3 CC-Link Connection (Intelligent Device Station)

This section describes the CC-Link connection (intelligent device station) that connects the GOT set as the intelligent
device station to the CC-Link network.
The following shows an example of connecting the GOT set as the intelligent device station to the CC-Link network.
Network No. 0, Station No. 0
(Master station)
Monitor target
Control
system
(System A)
(1) Connection method
Connect the CC-Link network system to the GOT.
For details, refer to the following.
(2) GT Designer3 setting
Set GT Designer3 as follows.
Setting item
Controller Type
Device setting (Network setting)
Q Redundant Setting
In this case, the GOT monitoring is performed by transient transmission of the CC-Link network system.
Therefore, a longer time-lag occurs for displaying objects compared with directly monitoring the PLC CPU.
For displaying objects with a shorter time-lag, set the device for RX, RY, RWw, RWr of the host station set in the
CC-Link network and execute the cyclic transmission.
For details, refer to the following.
4 - 18
4. HOW TO MONITOR REDUNTANT SYSTEM
4.3 CC-Link Connection (Intelligent Device Station)
CC-Link
MELSECNET/H remote I/O network
13. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
MELSEC-QnA/Q/QS, MELDAS C6*
Other
Do not set the item.
3.3
CC-Link System Access Range for Monitoring
Network No. 0, Station No. 1
(Standby master station)
Settings
NW No.: 0 (fixed)
Station No.: 0 (Master station)
CC-Link connection
GOT
Network No. 0,
Station No. 2
(Intelligent device station)
Standby system
(System B)
Model

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents