13.3.3 Switch setting (Only when
MODEL GT15-75J61BT13-Z
CC-Link communication unit is

used)

POINT
POINT
POINT
Switch setting of the communication unit
When using the MODEL GT15-J61BT13 CC-Link
communication unit, the switch setting is not needed.
For details of each setting switch and LED, refer to the
following manual.
GT15 CC-Link communication unit User's
Manual
GT15-75J61BT13-Z
Left side
RUN
L RUN
SD
RD
4
(1)
MODE
L ERR.
10
(2)
STATION NO.
1
(3)
BAUDRATE
(4)
SW
ON
OFF
1
HOLD
CLEAR
2
4
1
(1) Mode setting switch
Mode setting
Description
switch
Select the online mode.
(Default: 0)
(2) Station number setting switch
Station
number
Description
setting
switch
Specify the station No. of the CC-
Link communication unit.
(Default: 01)
Front side
1
3
5
7
DA
DG
NC
NC
2
4
6
8
DB
SLD (FG1) NC
Set value
0 (fixed)
Set value
1 to 64
13. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
(3) Transmission baudrate setting switch
Transmission
baudrate
Description
setting switch
Specify the transmission speed.
(Default: 0)
(4) Condition setting switches
Condition
Setting
setting
Description
switch
switches
Specify input data status of
SW1
the data link error station.
(Default: OFF)
Specify the number of stations
SW2
occupied.
(Default: OFF)
POINT
POINT
POINT
(1) Switch setting example
For the switch setting example, refer to the
following.
13.4 PLC Side Setting
(2) When the switch setting is changed
When changing the switch setting after mounting
the MODEL GT15-75J61BT13-Z CC-Link
communication unit on the GOT, reset the GOT.
13.3 GOT Side Settings
9
Set value
0: 156kbps
1: 625kbps
10
2: 2.5Mbps
3: 5Mbps
4: 10Mbps
Set value
11
OFF: Cleared
ON: Held
OFF: 1 station
ON: 4 stations
12
13
14
15