Mitsubishi Electric GT1685 Connection Manual page 416

Got1000 series
Table of Contents

Advertisement

(b) Network range assignment
Item
Total stations
Start
Station
No.1
End
LB
Start
Station
No.2
End
LB/LW
settings (1)
Start
Station
No.1
End
LW
Start
Station
No.2
End
*1
LX/LY settings
Monitoring time
*1
Specify I/O master station
Specify reserved station
Supplementary settings
: Necessary
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the C Controller
module (Q Series), either turn the C Controller module
(Q Series) OFF and then ON or reset it.
11 - 22
11. CC-Link IE CONTROLLER NETWORK CONNECTION
11.4 PLC Side Setting
Setting
necessity at
Set value
GOT
connection
2
0000
H
00FF
H
0100
H
01FF
H
00000
H
000FF
H
00100
H
001FF
H
No setting
(Use default value)
No setting
No setting
(Use default value)
: As necessary
: Not necessary
(c) Routing parameter setting
Up to 238 [Transfer Network No.]s can be set.
However, the same transfer network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 238 kinds of
[Transfer Network No.]s.
Item
Transfer target network No.
Relay network No.
Relay station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
11.3.3 Routing parameter setting
Range
1 to 239
1 to 239
1 to 120

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents