Mitsubishi Electric GT1685 Connection Manual page 747

Got1000 series
Table of Contents

Advertisement

Write Check
Sheet
22.5
Multi-channel Function
Check Sheet
Write down the following items to the check sheet.
Attaching the communication unit
1.
Write down the name of communication unit to be used for each of the
connection type.
* For the GT155 , setting is made only for Extension interface 1.
When GT15-QBUS2/ABUS2 is used, although GT15-RS2-9P is installed physically at the
2nd stage of extend interface 2, the GOT recognizes the position as the 1st stage.
Therefore, in the check sheet, the position should be entered as 1st stage.
2.
After writing down the names of communication units, write down CH
No. to be assigned to respective units based on the entry in ■ Check
Sheet No. 1 (selection of connection type and interface).
(Continued to next page)
22. MULTI-CHANNEL FUNCTION
22.3 GOT Side Settings
17
18
19
20
21
22
23
22 - 33