Mitsubishi Electric GT1685 Connection Manual page 149

Got1000 series
Table of Contents

Advertisement

1.
Set the screen switching device of the base screen.
Choose [Common]
[GOT Environmental Setting]
GD100 as the base screen switching device.
(Do not use PLC CPU devices for the screen switching device. If used, the Status Observation operation of the GOT
may be disabled since the device data of the PLC CPU is overwritten by the device value transferred with the
redundant system tracking function)
2.
Set the Status Observation.
Make the setting so that the base screen 1 is displayed when the connected PLC CPU is the standby system
(SM1515 is OFF) in the project specified by selecting [Common]
Condition 1 : SM1515 (while OFF)
Operation : GD100=1
Create the status observation in the project on the Project tab.
[Screen Switching/Window], and set the internal device
[Status Observation].
When the SM1515 is OFF, the connected PLC CPU is the standby system.
The screen switches to the base screen 1.
4. HOW TO MONITOR REDUNTANT SYSTEM
4.2 Direct CPU Connection
1
2
3
4
5
6
7
8
4 - 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents