Mitsubishi Electric GT1685 Connection Manual page 188

Got1000 series
Table of Contents

Advertisement

When 2 to 3 GOTs are connected
Extension base
Main base unit
unit
Extension cable
Extension
Extension
Main base
*1
cable
-
Extension
Extension cable
Main base
-
Extension
Extension cable
-
Main base
Extension
Extension cable
*1
For the extension cables, refer to MELSEC-A/QnA catalog (L(NA)08024).
*2
When installing the GOT 6.6m or more away from the main base unit, the bus connector conversion box is required.
*3
When connecting to multiple GOTs with GT 16, GT15 and GT11 mixed, use GT11 as a terminal.
*4
When using GT15-C EXSS-1 or GT15-C BS, connect as following precautions.
*5
The number of connectable GOTs is restricted according to the CPU type and the number of intelligent function modules.
5 - 12
5. BUS CONNECTION
5.2 System Configuration
Bus extension
connector box
Connection cable 1)
Connection cable 2)
*5
PLC
Connection cable 1)
base
-
-
-
base
-
GT15-AC06B(0.6m)
GT15-AC12B(1.2m)
GT15-AC30B(3m)
GT15-AC50B(5m)
base
-
-
-
base
5.4.1 GT15-C [ ] EXSS-1, GT15-C [ ] BS
5.4.12 When connecting multiple GOTs
1st GOT
Connection cable 3)
Connection cable 2)
Bus connector
*2
conversion box
-
GT15-C12NB(1.2m)
GT15-C30NB(3m)
GT15-C50NB(5m)
-
GT15-C100EXSS-1(10m)
A7GT-CNB
GT15-C200EXSS-1(20m)
*4
-
GT15-C12NB(1.2m)
GT15-C30NB(3m)
GT15-C50NB(5m)
-
2nd GOT
3rd GOT
Connection cable 4)
*3
GOT (1st)
Option device
Model
*6*7
GT15-75ABUS2L
GT15-ABUS2
GT15-75ABUS2L
GT15-ABUS2
GT15-75ABUS2L
GT15-ABUS2
GT15-75ABUS2L
GT15-ABUS2
GT15-75ABUS2L
GT15-ABUS2
GT15-75ABUS2L
GT15-ABUS2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents