Mitsubishi Electric GT1685 Connection Manual page 78

Got1000 series
Table of Contents

Advertisement

(2) For CC-Link IE Controller Network system
The communication status between the GOT and CC-Link IE Controller Network can be confirmed by the utility
screen of the GOT.
For details on the operation method of the GOT Utility screen, refer to the following manual.
(3) For CC-Link IE Field Network system
The communication status between the GOT and CC-Link IE Field Network can be confirmed by the utility
screen of the GOT.
For details on the operation method of the GOT Utility screen, refer to the following manual.
1 - 44
1. PREPARATORY PROCEDURES FOR MONITORING
1.6 Checking for Normal Monitoring
GT16 User's Manual (Basic Utility)
GT15 User's Manual
GT16 User's Manual (Basic Utility)
GT15 User's Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents