Mitsubishi Electric GT1685 Connection Manual page 414

Got1000 series
Table of Contents

Advertisement

(b) Network range assignment
Item
Monitoring time
Start
Station
No.1
End
LB
Start
Station
No.2
LB/LW
End
setting(1)
Start
*1
Station
No.1
End
LW
Start
Station
No.2
End
*1
LX/LY setting
*1
Specify I/O master station
Specify reserved station
Supplementary setting
: Necessary
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the PLC CPU,
operate the PLC CPU ether turning OFF and then ON
or resetting.
11 - 20
11. CC-Link IE CONTROLLER NETWORK CONNECTION
11.4 PLC Side Setting
Setting
necessity at
Set value
GOT
connection
2000
0000
H
00FF
H
0100
H
01FF
H
00000
H
000FF
H
00100
H
001FF
H
No setting
No setting
No setting
(Use default value)
: As necessary
: Not necessary
(c) Routing parameter setting
Up to 238 [Target Station Network No.]s can be set.
However, the same target station network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 238 kinds of
[Target Station Network No.]s.
Item
Target Station network No.
Relay Station network No.
Relay station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
11.3.3 Routing parameter setting
Range
1 to 239
1 to 239
1 to 120

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents