Pre-Power Up Checks

1.
Locate the installation items; materials, startup kit, etc., and compare the contents against
the packing slip.
2.
Inspect the exterior doors and panels for proper alignment and shipping damage.
3.
Make sure the oven, canister bay, and the upper doors appear properly aligned and
open/close freely.
4.
Verify that the top panel, top door, and oven door interlock flags appear to be centrally
aligned to the sensor vanes on the system.
FORTUS 360mc/400mc Service Manual
Figure 3-2: Interlock Flags
Interlock Flag
Sensor
Vanes
Interlock Flag
(3X)
3-3