Pm Procedure Checklist; Preventive Maintenance Procedures; Lubricate The X Y Gantry Guide Rods - Stratasys FORTUS 360mc Service Manual

3d production system
Hide thumbs Also See for FORTUS 360mc:
Table of Contents

Advertisement

PM Procedure Checklist

PM Checklists are available from the Stratasys website. There is a 12 month PM checklist to
be completed every 12 months. In addition to the 12 month checklist, there is a 24 month
supplemental checklist to be completed in addition to the 12 month checklist every 24
months. Each PM interval has a PM kit includes any items needed to complete the PM visit.
PM Checklists are also included with the PM kits.

Preventive Maintenance Procedures

Lubricate the X Y Gantry Guide Rods

Pulley bearings of the gantry are sealed. Do not lubricate. Replace
bearings that are not operating smoothly. (See
page 5-28.)
1.
Use a clean dry towel to remove old grease from the exposed surfaces of X and Y guide
rods. There are two guide rods for each axis.
2.
Apply a thin layer of Krytox to the entire exposed surface of the guide rods.
3.
Distribute the grease along the rods by manually moving the X and Y carriages to the full
extent of their travel. Do this several times.
Lubricate X Guide Rods
With Krytox Grease Only
FORTUS 360mc/400mc Service Manual
Figure 8-1: X Y Gantry Lubrication
"X and Y Pulley" on
Lubricate the Y-Axis Guide
Rods with Krytox Grease Only
(Figure
8-1)
8-2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents