B.
Figure 5-3: UPS 5115 Power Switch Access (Lower Back Panel)
6.
Isolate the system from the electrical power source.
System Power Up
If the system was powered down using the Operator Power Down
procedure, use the Operator Power Up procedure. If the system was
powered down using the System Power Down procedure, use the
System Power Up procedure.
Procedure
1.
Connect the system to the electrical power source.
2.
Place the main power breaker in the ON position (accessed from back of the system at the
lower right side).
3.
Switch the UPS circuit breaker to the ON position.
4.
If the UPS does not power on automatically, do the following:
A.
B.
5.
Press the power On button (green button) on the system front panel.
6.
The system will power up in approximately 5 minutes or less.
FORTUS 360mc/400mc Service Manual
For a 5115 UPS systems - Power down the UPS by pressing and
holding the top button on right side of the UPS panel (accessed
from back of the system).
UPS On/OFF
For 5125 UPS systems -
seconds (upper button on right side of UPS panel).
For 5115 UPS systems -
Press and hold the UPS power button for two
The UPS will power up by itself.
UPS
Circuit Breaker
Main Power
Breaker
5-9