Ac Board Installation - Stratasys FORTUS 360mc Service Manual

3d production system
Hide thumbs Also See for FORTUS 360mc:
Table of Contents

Advertisement

AC Board Installation

Tools and Materials Required
• 5/32-inch hex key
• 7/16-inch open end wrench
• #2 Phillips screwdriver
• ESD wrist strap
Procedure
Caution: Wear an ESD wrist strap when working with the AC board.
If the system has been disconnected from its AC source, the system
frame will not be a proper ground. Attach the wrist strap to a known
good ground such as a steel electrical conduit.
1.
Remove the AC board from the static protection bag.
Caution: Use care not to scrape the bottom surface of the board
when positioning the AC board.
2.
Properly position the AC board in the system.
3.
Loosely install the five AC filter lug nuts (with washers) and eleven mounting screws to
align the board.
4.
Tighten the eleven mounting screws.
Improper grounding of the AC board can cause intermittent
machine operation problems. Intermittent problems may result if all
eleven mounting screws are not installed and properly tightened.
FORTUS 360mc/400mc Service Manual
Figure 5-52: AC Board AC Filter Lug Nuts Locations
Location of 5 AC
Filter Lug Nuts
5-77

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents