Basic Setup; Making The Network Connection; Making The External Air Connection; Making The Power Cable Connection - Stratasys Fortus 360mc User Manual

Hide thumbs Also See for Fortus 360mc:
Table of Contents

Advertisement

Basic Setup

Making the Network Connection

Processed job files are transferred to the 360mc/400mc modeler through your
facility's Ethernet network. An RJ45 network connector is located in the lower left
corner of the back panel for the network connection.

Making the External Air Connection

The external air connector is located in the lower left corner of the back panel.
(Figure
External Air Connector

Making the Power Cable Connection

Warning: A licensed electrician must perform all wiring from
service connect to the transformer, and from the transformer
to the system - including all connectors, cables and proper
strain relief.
This system requires a high voltage connection, which is made at the right, rear
corner of the system (as viewed from the rear). High voltage is applied to the
system via a Delta connection. The main breaker must be off until a Stratasys
Service Technician has verified the connection. This system is only provided with
a Delta connection.
Figure 2-2: Network Connection
RJ45 Connector
2-3)
Figure 2-3: External Air Connection
(Figure
2-4)
2-2
(Figure
2-2)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents