AC Power Verification
A licensed electrician must make all connections from the power
supply to the system. This including connectors, cables, and proper
strain relief.
1.
Make sure the main AC electrical service to the system is disconnected from the facility
power.
2.
Open the high-voltage AC access door and make sure the incoming AC and ground lines
are secure.
3.
Close and secure the high-voltage AC access door and connect AC power to the system.
FORTUS 360mc/400mc Service Manual
Figure 3-19: System AC Power Connections
Ground
3-12