System Verification And Calibration - Stratasys FORTUS 360mc Service Manual

3d production system
Hide thumbs Also See for FORTUS 360mc:
Table of Contents

Advertisement

System Verification and Calibration

1.
Perform an Autohome XYZ calibration.
2.
Verify that the head cooling, oven blower, and top ventilation fans are operating
normally.
3.
Verify that the air pressure and flow is set to specifications. (See
Flow Adjustment" on page
• Internal Air 36-40 psi.
• External Air 48-52 psi.
4.
Make sure the air drying unit cycles in 30 second intervals.
5.
Place the canisters in all available bays and verify that all canisters are being read
correctly (Modeler Status > Material Status).
6.
Load and unload material from each bay to verify that all material bays successfully load
to the head.
7.
Verify the platen level. (See
8.
Very the upper Z stage hard stop adjustment. (See
Adjustment" on page
9.
Set machine default (Maintenance > Modeler Default):
• Inches or centimeters.
• User placement to ON (recommended).
10.
Load model and support material to the head.
11.
Perform an Auto Tip-to-Tip Calibration (Operator Control > Calibrate > AutoCal Tips).
(See
"Z Zero Calibrations" on page
12.
Perform the XYZ tip offset calibration. (See
FORTUS 360mc/400mc Service Manual
6-34.)
3.5 and 4.0 SCFH
3.5 and 4.0 SCFH
"Platen Level Adjustment" on page
6-16.)
6-3.)
"Air Pressure and Air
6-12.)
"Upper Z Stage Hard Stop
"XYZ Tip Offset" on page
6-6.)
3-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents