Site Preparation Guide
AC Power Requirements
•
50/60 Hz.
•
Voltage: 100-132, 200-240 VAC.
•
Maximum input voltage variation: ±10% of nominal
•
Current: 15/7A.
•
The grounded electrical outlet must connect to either a Euro or a US power cord plug
(provided in the Welcome Kit) and must be located within 6 feet (1.83m) of the printer.
Operation of the printer outside this range is not recommended; degradation of performance
and shortened component life expectancy will be experienced. Facilities who are unsure of
their power quality should contact their service provider.
Workstation Requirements
For GrabCAD Print workstation requirements please visit:
http://help.grabcad.com/article/195-system-requirements-for-grabcad-print.
For Insight workstation requirements please visit the Stratasys website.
LAN Requirements
If utilizing a LAN connection for communication and file transfer functions, the LAN connection
is a 100 base T, Ethernet protocol, RJ45 connector. One 15 foot (4.57 m) CAT6, 10/100 base T
cable is supplied with the printer, located in the Welcome Kit. The printer will function in either
DHCP or Static IP configurations.
A LAN connection is not required however, as the printer is also capable of file transfer via a
Wi-Fi connection or a USB flash drive plugged into either of the printer's USB ports. See the
F123 Series User Guide for detailed information and instructions on transferring files to the
printer.
Caution:
A power cable is provided for connecting the printer to the AC electric source. Do not
use it with other equipment.
Caution:
Do not use an extension cord or power strip; doing so can result in intermittent power
issues. Connect the power cord directly into the receptacle or UPS.
Site Requirements
Page 9