Y Block; Y Block Removal - Stratasys FORTUS 360mc Service Manual

3d production system
Hide thumbs Also See for FORTUS 360mc:
Table of Contents

Advertisement

Y Block

Y Block Removal

Tools and Materials
• 5/32-inch hex key
Procedure
1.
Unload filament from bay(s). (See
page
2-36)
2.
Power down the system. (See
3.
Remove the middle back panel. (See
4.
Disconnect filament tubes from the Y block. Push in on the end of the fitting to release the
tube.
5.
Disconnect the air dryer tube from the Y block.
6.
Remove the Y block mounting screws using a 5/32-inch hex key and remove the Y block
from the system.
Mounting Screws
Push In To
Release Tube
FORTUS 360mc/400mc Service Manual
"Loading/Unloading Filament to the Head" on
"System Power Down" on page
"Panel Removal" on page
Figure 5-80: Y Block and Fix Labels
5-8.)
5-6.)
Filament Tubes
From Canisters
Air Dryer Tube
Filament Tube
To Head
5-116

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents