Initialization Calibration Timeline - Bayer HealthCare RapidPoint 400 Series Service Manual

Table of Contents

Advertisement

Initialization Calibration Timeline

Calibration
Number
1
2
3
4
5
6
7
8
9
10
11
12
After calibration number 12 the system performs a 1-point calibration every
30 minutes with every fourth calibration a 2-point calibration, until the end
of the initialization and retrospective calibration (retrocal) period. All
calibrations after calibration number 12 are interruptible.
The initialization and retrospective calibration (retrocal) periods are not
complete until either 7.5 hours has passed or all of the following are true:
two scheduled calibrations occurred after calibration number 12
both calibrations passed the first time without a repeat
no samples were run between the two scheduled calibrations
When the initialization and respective calibration (retrocal) are complete,
the scheduled calibration timeline of 1-point calibrations every 30 minutes,
2-point calibrations every 2 hours, and a full 2-point calibration every
8 hours begins.
On Rapidpoint 405 systems, all 2-point calibrations are replaced by
NOTE:
full calibrations for the first 24 hours.
Rev. C
Time Elapsed
Sequence
(min.)
Full 2-Point
2-Point
Full 2-Point
20
2-Point
44
1-Point
66
1-Point
88
1-Point
110
2-Point
133
1-Point
155
1-Point
177
1-Point
200
Full 2-Point
225
Time Since
Last Cal (min.)
20
20
20
20
20
20
20
20
20
About Rapidpoint 400 Series Calibrations 431
Interruptible /
Uninterruptible
Uninterruptible
Uninterruptible
Uninterruptible
Uninterruptible
Interruptible
Interruptible
Interruptible
Uninterruptible
Interruptible
Interruptible
Interruptible
Uninterruptible

Advertisement

Table of Contents
loading

Table of Contents