JLG sky trak mmv Service Manual page 118

Table of Contents

Advertisement

Cab, Covers and Mirrors
40. Connect the transmission selector switch wiring
connector (1), turn signal/lights lever wiring
connectors (2) and brake switch connector (3).
3
41. Pull the cab heater and air conditioning controls
panel (4) wiring harness connectors through the
openings in the dash and connect to the appropriate
controls.Install the control panel using the four
#8-32 x1/2" self-tapping screws (5).Pull the entire
control panel out and label and disconnect the wiring
connectors from the switches. Set the panel and
screws aside for later reassembly.
5
42. Pull the switch bank wiring harness connectors
through the openings in the dash to the right and left
of the steering column and connect to the appropriate
switches. Install the switch banks (6 and 7) into the
dash.
3.20
2
1
MT1890
5
4
OS2032
6
43. Working through the display panel opening, connect
the hourmeter wiring connectors to the
hourmeter (8).
44. Connect the 8-pin male (9), 10-pin gray female (10),
8-pin female (11), 10-pin black female (12) and 7-pin
female (13) display panel connectors from the
harness and remove display panel from the front
dash.
45. Install the display panel (14) and secure with four
#10-32 x 3/4" button head screws (15).
46. Install the lower dash cover (16) and secure with
three #12-14 x 1" self-drilling screws (17) (one screw
not visible in illustration).
7
14
9
10
11
13
12
8
Model MMV Rev. 12/04
MM2170
15
MT20602

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents