M800V/M80V Series PLC Development Manual
6 Explanation of Built-in Editing Function (PLC On-board)
6.18 Parameter Menus
6.18.5.8 Setting the Execution Sequence
Rules for execution sequence settings
The following table describes the rules and precautions regarding the configuration of execution sequence settings using the
PLC On-board.
The sequence cannot be set for projects that are not usable.
The same execution sequence number cannot be set to multiple projects for which the execution project is set to [ON].
The execution sequence is ignored if the execution project is set to [OFF].
The execution sequence when the execution project is set to [OFF] is automatically set to the next sequence number from
the execution end position of executing projects set in the NC.
Projects for which the execution project is set to [ON] are executed in order from the lowest number set in the execution
sequence.
Entering the execution sequence
(1) Press the [LIST] menu to select the list.
(2) Use the up and down arrow keys to move to the position of the line for the execution sequence to be set in the list.
(3) Refer to "Setting selection items in lists" in "Operation Key List :Basic Operation Keys." Pressing the [INPUT] key while
the cursor is in the execution sequence display field changes the display of the sequence between one to the maximum
project no. from the lowest number.
(4) In accordance with the previously described rules and precautions, select the execution sequence for the project at the
set position.
IB-1501614-B
Setting Rules and Precautions
570