Mitsubishi Electric M800VW Series Manual page 99

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.4 Preparation
 For the machine sequence
Set the following items in the order of the list.
Item
PC side I/F
Network No.
Station No.
Protocol
PLC side I/F
Module name
Station No.
IP address
IP Input Format
Station No. <-> IP information
Other Station Setting
Check at communication time (sec.)
Retry Times
Network Communication Route Detailed setting of
Ethernet
Access to Ethernet module set on PCL side I/F
(*1) Double-click [Ethernet Board] to display the setting item.
(*2) Double-click [Ethernet Module] to display the setting item.
(*3) Double-click [Other Station (Single network)] to display the setting item.
(*4) Double-click [Ethernet] to display the setting item.
[Transfer Setup Connection 1 screen]
When the above setting is completed, press [Connection Test].
If connection is successful, the message "Connected with Q26UDHCPU" is displayed with the multi-CPU connection status
below the message. This indicates the connection status of each project.
IB-1501614-B
Setting
Ethernet Board
1
1
TCP
Ethernet Module
QJ71E71
1
IP address of CNC
DEC.
Automatic Response System
Other Station (Single Network)
Arbitrary time (approximately 10 seconds and
longer)
0
74
Remarks
(*1)
(*1)
(*1)
(*2)
(*2)
(*2)
(*2)
(*2)
(*3)
(*3)
(*4)

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800vs seriesM80vw seriesM80v seriesM850vwM830vwM850vs ... Show all

Table of Contents