Mitsubishi Electric M800VW Series Manual page 271

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.16 Displaying Project Verification Result in Ladder Diagram (GX Works3)
(3) Execute [Convert] - [Convert], and save the project.
When you convert the project with labels set, the following procedures are required before conversion.
(a) Select [Parameter] - [C120CPU] - [CPU Parameter] on the "Navigation" window.
(b) Select [Memory/Device Setting] - [Device/Label Memory Area Setting] on the "Setting Item List".
(c) Select [Device/Label Memory Area Capacity Setting] - [Label Area] - [Label Memory Area Capacity], and set a value
larger than "0 K" to this item.
(4) The second project data can also be opened by the operations (2) and (3).
(5) Open [Project] - [Project Verify] on the other project of the verification targets.
(6) Set the other project in [Verify Destination], and click [Verify].
IB-1501614-B
246

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800vs seriesM80vw seriesM80v seriesM850vwM830vwM850vs ... Show all

Table of Contents