Development Procedure; Developing New Simple Projects On Gx Works2 - Mitsubishi Electric M800VW Series Manual

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.7 Developing Structured Project

5.7.2 Development Procedure

One of the standard procedures for developing structured projects is to create on GX Works2.

5.7.2.1 Developing New Simple Projects on GX Works2

Development procedure
Start GX Works2
(1)
Create a new project
(2)
Set connection with CNC controller
(3)
Set parameters
(4)
 Program setting of PLC parameters, the number of device
points in CNC, and the number of device points in GX Works2
must be consistent.
Configure Program
(5)
 Create and register program files, tasks and POUs (e.g. func-
tion blocks).
Set labels
(6)
 Set global labels and local label.
 Set the range for automatically assigned devices.
Edit sequence program
(7)
Write sequence programs and parameters into CNC RAM
(8)
 Sequence programs are written into temporary memory (CNC
RAM).
Monitor (debug) sequence programs
(9)
 Return to (7) if any bug is found.
After debug is completed, write sequence programs to ROM in
(10)
CNC.
 Sequence programs in temporary memory (CNC RAM) is
transferred to CNC ROM.
Note
(1) If character string that cannot be used, "Label/data name contains invalid character string. Unable to use devices." is dis-
played when a project is compiled, reserved characters are used in the file name. Change the file name. Unable to use
devices." reserved characters are used in the file name. Change the file name.
(2) The timer limit setting must be fixed to "100ms" for low speed or "10.00ms" for high speed. It can be set on [PLC System]
tab on the [Q Parameter Setting] setting screen displayed by selecting [Parameter] - [PC Parameter] of the project view.
The CNC is not compatible with any other value described above for the timer limit.
IB-1501614-B
Reference
-
5.5.5 Creating Project
5.4.2.5 Setting Connection Destination
5.5.8 Setting the Parameters
"GX Works2 Operating Manual (Structured Project)"
5.10 Creating Label
"GX Works2 Operating Manual (Structured Project)"
Ladder Diagram
"GX Works2 Operating Manual (Simple Project)"
ST Language
"GX Works2 Operating Manual (Structured Project)"
5.5.8.6 Writing and Reading Parameters to CNC Controller
5.7.4 Writing the Sequence Program to the CNC Controller
"GX Works2 Operating Manual (Simple Project)"
5.7.6 Writing Sequence Programs to ROM in CNC
158

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800vs seriesM80vw seriesM80v seriesM850vwM830vwM850vs ... Show all

Table of Contents