Select Project - Mitsubishi Electric M800VW Series Manual

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
6 Explanation of Built-in Editing Function (PLC On-board)
6.12 Main Screen

6.12.4 SELECT PROJECT

When using multiple projects, the current project needs to be selected. The area with the blue background color in the list
displayed in the main screen represents the current project. Multiple projects cannot be selected as the current project for
operation.
When using only one project, project 01 automatically becomes the current project and thus there is no need to select the
current project.
If the current project selected is changed, the menu keys change in correspondence with how sequence programs are stored.
When the smart safety observation function is enabled, as the user safety sequence "SafePLC1" or "SafePLC2" is displayed,
select "SafePLC1" or "SafePLC2" to use the user safety sequence.
Use one of the following two methods to change the currently selected project.
 Method using the project selection menu key
Pressing the project selection menu key moves down the selected position in the list of project information. Pressing the menu
key when the project at the bottom of the list is selected selects the project at the top of the list.
 Method using the up and down arrow keys
Pressing the down arrow key moves down the selected position in the list of project information.
Pressing the up arrow key moves up the selected position in the list of project information.
345
IB-1501614-B

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800vs seriesM80vw seriesM80v seriesM850vwM830vwM850vs ... Show all

Table of Contents