M800V/M80V Series PLC Development Manual
9 Appendix 3: PLC Function
9.1 Enhanced PLC Security Mode
(2) Set the multi-project parameters
Modify the multi-project parameters from PLC on-board based on the setting details determined in "Determine the setting
details".
Specify the number of devices, project execution order, and the number of steps for each project.
The number of steps refers to the upper limit of the total number of steps of the sequence programs stored in each proj-
ect, and is determined by the project ratio.
[Project setting]
[Device setting]
611
IB-1501614-B