ENGINE REMOVAL/INSTALLATION
Set the dowel pin (10 x 16 mm) [1] and dowel pin (14 x
15 mm) [2] to the mount case.
Install a new mount case gasket [3].
Slowly install the engine assembly on the engine mount
case [4]. Be careful not to let the shift shaft B position
come out of alignment.
Tighten the bolts from the under side of the mount case
in the numbered order to the specified torque.
Before tightening the flange bolt (10 x 120 mm) [1],
apply engine oil to their threads and seating surfaces.
TORQUE:
44 N·m (4.5 kgf·m, 32 lbf·ft):
bolts (10 x 60 mm) [2] (two)
flange bolts (10 x 70 mm) [3] (two)
bolt (10 x 85 mm) [4] (one)
flange bolt (10 x 120 mm) (one)
75 N·m (7.6 kgf·m, 55 lbf·ft):
bolt/washer (12 x 65 mm) [5] (one)
bolt/washer (12 x 120 mm) [6] (two)
flange bolts (12 x 120 mm) [7] (two)
13-8
Viewing from the under side of the mount case.
[7]
[1]
[3]
[6]
8
7
9
1
2
3
11
5
[5]
[2]
Cruising direction
[1]
[2]
[3]
[4]
[7]
[3]
[6]
10
6
4
[4]
[2]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents