Led Setting Of Operation Switch (Gt2506Hs-V) - Mitsubishi Electric GOT2000 Series Hardware User Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

LED setting of operation switch (GT2506HS-V)

For operation check, the green LED is attached to the six operation switches (SW1 to SW6).
Each LED is related to the bit 0 to bit 5 of the word device.
The LED is lit when the bit value is 1, and not lit when it is 0.
Allocation of device to control LED
The device to control LED is allocated by the drawing software.
The external input and output function/output information (read device +1) set in [Read device (Controller→GOT)] of [System
information] in [GOT Environment Setting] from [Common Settings] is allocated to the LED control.
The following shows the relationship between each bit and the LED of the external input and output function/output
information.
The LED is lit when the bit value is 1 and not lit when the bit value is 0.
External input and output function/output information
b15
b14
b13
b12
For example, when D100 is set in the read device of system information, each bit value of D101 is reflected to the LED lit/not
lit.
SW1 SW2 SW3 SW4 SW5 SW6
b11
b10
b9
b8
b0 of D101→LED of SW1
b1 of D101→LED of SW2
b2 of D101→LED of SW3
b3 of D101→LED of SW4
b4 of D101→LED of SW5
b5 of D101→LED of SW6
b7
b6
b5
b4
SW6
SW5
9 HANDY GOT POWER WIRING AND SWITCH HANDLING
b3
b2
b1
b0
SW4
SW3
SW2
SW1
345
9.4 Switch Wiring
9

Advertisement

Table of Contents
loading

Table of Contents