Download Print this page

Flow Of System Operation; Flow Of All Processes - Mitsubishi A1SD75M3 User Manual

Positioning module

Advertisement

1 PRODUCT OUTLINE

1.2 Flow of system operation

1.2.1 Flow of all processes

Design
Preparation
Operation
Maintenance
The positioning control processes, using the AD75, are shown below.
AD75 software
package
1)
Understand the functions and performance, and determine the positioning operation method
2)
3)
Setting of the:
· Parameters
· Positioning data
· Start block data
· Condition data
Writing of setting data
7)
Monitoring with
test operation,
and debugging
of setting data
9)
Monitor
10)
11)
AD75
Servo, etc.
(system design)
Installation, wiring, single module test
5)
Servo starting up
Test operation
Actual operation
Maintenance
Disposal
1 - 14
MELSEC-A
GPP function soft-
PLC CPU
ware package
4)
Creation of sequence
program for operation
Refer to (Note)
6)
Writing of program
8)
Monitoring and
debugging of
operation
program
Monitor
(Note)
When not using the
AD75 software
package, carry out
setting, monitoring
and debugging of
the data in 3) with
the GPP function
software package.

Hide quick links:

Advertisement

loading

This manual is also suitable for:

A1sd75m2A1sd75m1Ad75m2Ad75m1Ad75m3