Flow Of System Operation; Flow Of All Processes - Mitsubishi MELSEC QD75P User Manual

Positioning module
Table of Contents

Advertisement

1 PRODUCT OUTLINE

1.2 Flow of system operation

1.2.1 Flow of all processes

The positioning control processes, using the QD75, are shown below.
GX Configurator-QP
1)
Design
3)
Setting of the:
· Parameters
· Positioning data
· Block start data
· Condition data
Preparation
Writing of setting data
7)
Monitoring with
test operation,
and debugging
of setting data
Operation
Maintenance
QD75
Understand the functions and performance, and determine the positioning operation method
2)
Installation, wiring
9)
Monitor
10)
11)
Get other manuals https://www.bkmanuals.com
Servo, etc.
(system design)
5)
Connection confirmation
Test operation
Actual operation
Maintenance
Disposal
1 - 15
MELSEC-Q
GX Developer
PLC CPU
4)
Creation of sequence
program for operation
Refer to (Note)
6)
Writing of program
8)
Monitoring and
debugging of
operation
program
Monitor
(Note)
When not using
GX Configurator
-QP, carry out
setting, monitoring
and debugging of
the data in 3) with
GX Developer.

Advertisement

Table of Contents
loading

Table of Contents