Honda 2004 Odyssey Service Manual page 1032

Hide thumbs Also See for 2004 Odyssey:
Table of Contents

Advertisement

Special Tools Required
• Mainshaft holder
07GAB-PF50101 or 07GAB-PF50100
• Adjustable bearing puller, 25 40 mm
07736-A01000B or 07736-A01000A
NOTE: Refer to the exploded view as needed during the
following procedure.
1. Remove the ATF temperature sensor connector
from the connector bracket, then disconnect the
connector.
2. Remove the ATF temperature sensor harness
clamp bolts and the ATF temperature sensor, then
remove the switch cover.
3. Remove the A/T wire harness ground terminal from
the connector bracket, and disconnect the 3rd
clutch transmission fluid pressure switch connector,
then remove the connector bracket.
4. Remove the transmission range switch cover.
5. Remove the transmission range switch harness
clamp bolts and harness clamp, then remove the
transmission range switch.
6. Remove the harness clamp bracket, ATF cooler line
bolts (two), and lines.
7. Remove the line bolt, the ATF hose, and the ATF
filter line.
8. Remove the ATF filter line bracket and ATF filter.
Remove the ATF passage body if necessary.
9. Remove the A/T clutch pressure control solenoid
valve C.
10. Remove the remaining 10 bolts on the end cover,
then remove the end cover.
11. Slip the special tool onto the mainshaft.
07GAB-PF50101 or
07GAB-PF50100
12. Engage the park pawl with the park gear.
13. Cut the lock tabs (A) of each shaft locknut (B) using
a chisel (C). Then remove the locknuts and conical
spring washers from each shaft.
NOTE:
• Countershaft and secondary shaft locknuts have
left-hand threads.
• Clean the old locknut; they are used to install the
press fit mainshaft 3rd gear, secondary shaft
idler gear, park gear, and 3rd clutch assembly on
the countershaft.
• Keep all of the chiseled particles out of the
transmission.
B
14. Remove the special tool from the mainshaft.
C
A
(cont'd)
14-419

Advertisement

Table of Contents
loading

Table of Contents