A/T Differential
Carrier Bearing Preload Inspection (cont'd)
7. Install the differential assembly (A), gasket (B), and
dowel pins (C) on the torque converter housing (D).
Align the spring pin on the control shaft (E) with the
transmission housing groove.
10 x 1.25 mm
44 N·m (4.5 kgf·m, 33 lbf·ft)
F
E
C
A
8. Install the transmission housing (F) with the
transmission hangers (G) and harness clamp
bracket (H), then tighten the bolts.
14-242
H
G
G
C
B
D
9. Rotate the differential assembly in both directions
to seat the bearings.
10. Measure the starting torque of the differential
assembly with the special tool, a torque wrench,
and socket. Measure the starting torque at normal
room temperature in both directions.
Standard:
New bearing:
2.7 3.9 N·m
(28 40 kgf·cm, 24 35 lbf·in.)
Reused bearings: 2.5 3.6 N·m
(25 37 kgf·cm, 22 32 lbf·in.)
07XAJ-S0KA100