Carrier Bearing Preload Inspection - Honda 2004 Odyssey Service Manual

Hide thumbs Also See for 2004 Odyssey:
Table of Contents

Advertisement

Carrier Bearing Preload Inspection

Special Tools Required
• Driver 07749-0010000
• Driver attachment 07HAD-SF10100
• Preload inspection tool 07XAJ-S0KA100
NOTE: If the transmission housing, torque converter
housing, differential carrier, tapered roller bearing,
outer race, or thrust shim were replaced, the bearing
preload must be adjusted.
1. Remove the bearing outer race (A), thrust washer
(B), and thrust shim (C) from the transmission
housing (D) by heating the housing to about 212°F
(100°C) with a heat gun (E). Do not heat the housing
in excess of 212°F (100°C).
NOTE: Let the transmission housing cool to room
temperature before adjusting the bearing preload.
E
D
C
B
2. Replace the tapered roller bearing when the outer
race is to be replaced.
3. Do not use a shim on the torque converter housing
side.
A
4. Install the 76 mm thrust shim (A), thrust washer (B),
and bearing outer race (C) in the transmission
housing (D). If you replace the 76 mm thrust shim
with a new one, use the same thickness shim as the
old one.
D
5. Drive the outer race with the special tools, and
install it securely in the transmission housing.
6. Check that there is no clearance between the thrust
washer, outer race, shim, and transmission
housing.
C
B
A
07749-0010000
07HAD-SF10100
(cont'd)
14-241

Advertisement

Table of Contents
loading

Table of Contents