Figure 110: Online Maintenance: Temporary Operation (Until Online Maintenance) - Fujitsu Siemens Computers SX series User Manual

Sx150 business server
Table of Contents

Advertisement

Dynamic Reconfiguration
1. Temporary operation (until online maintenance) with reduced resources
The entire procedure is illustrated with the figure below (CPU and memory values relate to
BS2000):
Normal operation
4 CPUs, 10 GB
Figure 110: Online maintenance: Temporary operation (until online maintenance) with reduced resources
After the failure the BS2000 partition continues to operate with the above-mentioned
reduced resources (see Restricted operation 1 in
values relate to BS2000) until the next online maintenance is performed.
The measures described below are performed by the service engineer at a time selected
by the customer, e.g. within a maintenance window:
1. XSB 00-1 can be disconnected from the partition using DR-disconnect, in which case the
partition operates with 2 CPUs (1 BS2000-CPU = 25%) and 8 GB of memory (6 GB of
BS2000 main memory = 60%) (see Restricted operation 2 in
With the remaining resources, in terms of its RPF performance the partition corre-
sponds to the SX150-10C model.
2. Remove the system board, repair or replace and install the system board.
3. Start up the two XSBs 00-0 und 00-1 with DR-connect.
This restores the initial status for this partition with 100% use of the CPUs and, in the ideal
case, of the memory.
U41272-J-Z385-3-76
Restricted
operation 1
3 CPUs, 6 GB
Failure, reboot,
autom. recovery
Functional scope, concepts and applications
Restricted
operation 2
1 CPU, 6 GB
DR-disconnect
and removal of
defective SB
figure
110, where the CPU and memory
Normal operation
4 CPUs, 10 GB
Installation of SB
and startup of XSBs
figure
110).
299

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents