Outlet Groups - LEGRAND Server Technology PRO3X User Manual

Hide thumbs Also See for Server Technology PRO3X:
Table of Contents

Advertisement

Apparent Energy
Power Factor
Crest Factor
Power-Off Period Options for Individual Outlets
There are two options for setting the power-off period during the power cycle on each individual
outlet's page.
Option
Function
PDU defined
Follows the global power-off period setting, which is set on
(configured value)
the PDU page. The value in parentheses is the current global
value.
Customized time

Outlet Groups

Only PDUs with outlet-switching and/or outlet-metering feature show this menu item.
Choose Outlet Groups in the Menu.
Required permissions:
You must have one of the permissions below to be able to operate all or some of the outlet group
features.
Administrator Privileges -- all operations
Change Pdu, Inlet, Outlet & Overcurrent Protector Configuration -- creating, editing and deleting

outlet groups

Switch Outlet Group -- powering on, off or cycle outlet groups
Outlet group data:
The Outlet Groups page will list all outlet groups you create.
For each group, you can view the following data on the Outlet Groups page:
Select an existing time option, or type a new value with an
appropriate time unit added, such as s for seconds.