Monitor Multiple Unit Controls - Fuji Electric FRENIC-HVAC User Manual

Frenic-hvac series
Hide thumbs Also See for FRENIC-HVAC:
Table of Contents

Advertisement

5.6.7.2

Monitor Multiple Unit Controls

PRG > 6(Tools) > 2(Multi-Op.Mon)
The status of cascade operations and mutual operations can be monitored.
< Cascade operation >
Fref
0.00
STOP
Iout
0.00A
PWR
0.03kW
PRG
1.Start-up
2.Function Code
3.INV Info
4.Alarm Info
5.User Config
6.Tools
/
PRG>6
1.PID Monitor
2.Multi-Op. Mon
3.CLogic Monitor
4.Resonant Avd.
5.Load Factor.
6.COM Debug
/
PRG>6>2
Cascade-Fixed
SV
62.3%
PV
91.2%
MV
15.0%
M0
M1
M2 M3
/
PRG>6>2
Cascade-Fixed
SV
0.82
m
3
/min
PV
1.20
m
3
/min
MV
10.00Hz
M0
M1
M2 M3
PRG>6
1.PID Monitor
2.Multi-Op. Mon
3.CLogic Monitor
4.Resonant Avd.
5.Load Factor.
6.COM Debug
Hz
Command value
Feedback value
Operation volume (control volume)
<Running status>
M0 blinking: Inverter drive;
M2 normal view: Stopped;
Command value
Feedback value
Operation volume (control volume)
<Running status>
M0 blinking: Inverter drive;
M2 normal view: Stopped;
Return to previous screen
1. Press the
key while the running mode
screen is displayed.
2. Use the
/
and confirm with the
3. Use the
/
Mon], and confirm with the
4. The status of cascade operations can be
confirmed.
M1
ON: Commercial drive;
M3 crossed out: Operation halted
5. Use the
/
units and switch to a percentage unit display.
M1
ON: Commercial drive;
M3 crossed out: Operation halted
6. Use the
key to return to the menu screen.
5-88
Return to running
keys to select [6. Tools],
key.
keys to select [2. Multi-Op.
key.
M0 blinking: Fire mode
keys to display physical
M0 blinking: Fire mode

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents