Inverter Information; Confirm Power Level - Fuji Electric FRENIC-HVAC User Manual

Frenic-hvac series
Hide thumbs Also See for FRENIC-HVAC:
Table of Contents

Advertisement

5.6.4

Inverter Information

PRG > 3(INV Info)
5.6.4.1

Confirm Power Level

PRG > 3(INV Info) > 1(Energy Monitor)
This allows confirmation of accumulated power level data calculated by the inverter. Cumulative
time can be selected in units of hours, days, weeks or months, with 48 elements stored for each. For
example, if months are chosen as the unit, a long period of cumulative power can be confirmed for
up to 48 months (four years).
Fref
0.00
Hz
STOP
Iout
0.00A
PWR
0.03kW
PRG
0.Quick Setup
1.Start-up
2.Function Code
3.INV Info
4.Alarm Info
5.User Config
/
PRG>3
1.Energy Monitor
2.Op. Monitor
3.I/O. Check
4.Maintenance
5.Unit Info
/
PRG>3>1
|→2012/Feb/07 04:00
⇔Monthly
1:
1000kWh,
150h
2:
0.0kWh,
0.000h
3:
0.0kWh,
0.000h
4:
0.0kWh,
0.000h
Return to previous screen
1. Press the
key while the running mode
screen is displayed.
2. Use the
/
and confirm with the
3. Use the
/
Monitor], and confirm with the
4. 48 elements for a long period of cumulative
power can be confirmed.
5-65
5.6 Programming Mode
Return to running
keys to select [3. INV Info],
key.
keys to select [1. Energy
key.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents