Avaya G700 Maintenance Manual page 301

Gateway/ server or an
Hide thumbs Also See for G700:
Table of Contents

Advertisement

A DEFINITY Server-Controlled Maintenance: Capacity Constraints and Feature Limitations
Table 118. Media Module Tests Continued
Media Module
Maintenance for S8300/S8700 and G700
555-234-101 — Issue 2 — October 2002
Maintenance
Test
Object
DS1 ISDN
NPE Crosstalk Test (#6)
Trunk (ISDN-
Conference Test (#7)
TRK)
Port Audit and Update Test (#36)
Signaling Line State Check Test
(#255)
Service State Audit Test (#256)
Call State Audit Test (#257)
ISDN Test Call Test (#258)
ISDN-PRI
NPE Crosstalk Test (#6)
Signaling Link
PRI Port Test (#643)
Port (ISDN-
LNK)
ISDN-PRI
Primary Signaling Link Hardware
Signaling
Check (#636)
Group (ISDN-
Secondary Signaling Link
SGRP)
Hardware Check (#639)
Layer 2 Status Test (#647)
Wideband
Remote Layer 3 Query Test
Access
(#637)
Endpoint Port
Looparound and Conference
(WAE-PORT)
Test (#33)
Port Audit and Update Test (#36)
Executed for
Media Module
Abort
Abort
Yes
Yes
Yes
Yes
Abort
Abort
Yes
Yes
Yes
Yes
Yes
Abort
Yes
4 of 5
301

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8700S8300

Table of Contents