Configuration Tasks; Creating A Basic Configuration - Juniper JUNOSE 11.1.X - LINK LAYER CONFIGURATION 4-7-2010 Configuration Manual

For e series broadband services routers - link layer configuration
Table of Contents

Advertisement

JUNOSe 11.1.x Link Layer Configuration Guide

Configuration Tasks

The following sections describe how to perform these ATM configuration tasks:

Creating a Basic Configuration

To configure ATM, perform the following tasks. (Figure 3 on page 23 shows the
relationship of Steps 1 through 3.)
1.
2.
3.
4.
5.
22
Configuration Tasks
Configure an ATM physical interface.
host1(config)#interface atm 0/1
Configure an ATM 1483 subinterface.
host1(config-if)#interface atm 0/1.20
Configure a PVC by specifying the VCD, the VPI, the VCI, and the encapsulation
type.
host1(config-subif)#atm pvc 10 15 22 aal5snap
Assign an IP address and subnet mask to the PVC.
host1(config-subif)#ip address 192.32.10.20 255.255.255.0
(Optional) Verify your configuration using the appropriate show commands.
host1#show atm interface atm 0/1
host1#show atm vc atm 0/1 10
host1#show atm subinterface atm 0/1.20

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the JUNOSE 11.1.X - LINK LAYER CONFIGURATION 4-7-2010 and is the answer not in the manual?

This manual is also suitable for:

Junose 11.1.x

Table of Contents