Juniper JUNOSE 11.1.X - LINK LAYER CONFIGURATION 4-7-2010 Configuration Manual page 127

For e series broadband services routers - link layer configuration
Table of Contents

Advertisement

Alarm clear timeout Number of seconds that the router waits before
reporting that the PVC is up after the PVC stops receiving alarm cells
OAM VC verification Whether OAM verification is enabled or disabled
OAM loopback cell status:
disabled VC integrity disabled for VC
sent OAM loopback cell sent; waiting for response
received OAM loopback cell response received
failed OAM loopback reply not received within frequency period, or
reply contained a bad correlation tag
OAM VC status:
AIS VC is in AIS state
RDI VC is in RDI state
Down Retry OAM loopback failed; using retry frequency to verify that
the VC is really down
Down OAM loopback failed after Down Retry verification
Up Retry OAM loopback successful; using retry frequency to verify that
the VC is really up
Up OAM loopback successful after Up Retry verification
Not Managed VC integrity is not enabled; for more information about
this status value, see "Automatic Disabling of F5 OAM Services" on
page 20
OAM loopback frequency Frequency with which OAM loopback cells are
transmitted (when enabled), in seconds
OAM up retry count Number of consecutive successfully looped OAM cells
required to mark the VC as Up
OAM down retry count Number of consecutive unsuccessfully looped OAM
cells required to mark the VC as Down
OAM loopback retry frequency Frequency with which OAM cells are
transmitted in verification mode, in seconds
OAM CC verification Whether CC verification is enabled or disabled
OAM CC Type Whether the VC is a sink or a source, or both sink and source
end point
OAM CC Flow Type End-to-end or segment
OAM Current CC state
Ready OAM CC is not enabled
Active OAM CC cell flow is running
Chapter 1: Configuring ATM
95
Monitoring ATM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Junose 11.1.x

Table of Contents