Receiving The Printer; Inspect Crate For Damage; Preparing For Installation; Required Tools And Equipment - Stratasys Dimension Elite / 768 Site Preparation Manual

Hide thumbs Also See for Dimension Elite / 768:
Table of Contents

Advertisement

RECEIVING THE PRINTER

INSPECT CRATE FOR DAMAGE

Before opening the shipping crate, inspect the crate for signs of exterior damage.
Report evidence of excessive damage to Stratasys and the shipping company.

PREPARING FOR INSTALLATION

REQUIRED TOOLS AND EQUIPMENT

Basic hand tools (powered screwdriver or drill with Phillips bit).
A pallet jack or forklift will be needed to move the system.

UNPACKING THE PRINTER

The work area for unpacking the system should be 2.8 m (104 in.) high, 2.2 m (86 in.) wide and 1.9 m (76 in.)
deep.
For detailed unpacking and setup instructions, refer to Chapter 3 of the Dimension Elite User Guide.

SITE PREPARATION CHECKLIST

ELECTRICAL INSTALLATION REQUIREMENTS

A dedicated outlet of 100-240V ~15-7A 50/60 Hz 1200W has been installed.
The grounded electrical outlet is within 2 meters (80 inches) of the printer.
The grounded electrical outlet is able to accept either a Euro or US power cord plug.
The LAN connection is within 4 meters (14 feet) of the printer.

ENVIRONMENTAL REQUIREMENTS

The site's environmental temperature is between 59°F to 86°F (15°C to 30°C).
The site's environmental humidity is between 30% to 70%, non-condensing.
7

Advertisement

Table of Contents
loading

Table of Contents