Chapter 9 — Configuring and Using Media Lifecycle Management
3. In the PostScan Blackout Periods pane, use the Start and Stop drop‐
4. Click Save.
5. The blackout periods you set take effect when you enable PostScan for
August 2019
down lists to set the start and end times for the blackout period for each
day of the week.
Times are based on a 24‐hour clock, where 0 is midnight.
Notes:
To disable the blackout period for a specific day, set both
Start and Stop to 0.
By default, the blackout periods are all set to 0 (disabled). The
PostScan process runs whenever there are tapes in the
PostScan queue and a Global Spare drive is available.
Figure 133 Select the desired blackout periods for PostScan.
individual partitions by configuring one or more PostScan triggers (see
Enable and Configure MLM PreScan and PostScan on page 180).
Enabling MLM and Configuring Global
User Guide—Spectra T950 Library
261