Chapter 5 — Operating the Library
C
ONTROLLING THE
The library power is controlled using the operator panel power button or
the BlueScale Soft Power feature.
Power On the Library
Before powering on the library, make sure that all of the library's power
cables are plugged into AC outlets and that the AC breaker switches
corresponding to each cable, on the back of the main frame and each drive
expansion frame, are set to the on (up) position.
For redundant AC power configurations, connect the primary and secondary input
Important
for each frame to a separate branch circuit, which allows for failover in the event of
a power failure in one of the circuits (see
additional requirements).
August 2019
L
P
IBRARY
OWER
Figure 66 Connect the AC inputs and set the breaker switches to
the on position.
Controlling the Library Power
Power Specifications on page 481
Secondary AC input
Primary AC input
and breaker switch
and breaker switch
User Guide—Spectra T950V Library