Page 1
Spectra Tape Series Libraries T200, T380, T680, T950, and TFinity LCD Replacement Instructions SpectraLogic.com...
Page 2
United States Headquarters European Office Spectra Logic Corporation Spectra Logic Europe Ltd. Phone: 1.800.833.1132 or 1.303.449.6400 Phone: 44 (0) 870.112.2150 International: 1.303.449.6400 Fax: 44 (0) 870.112.2175 Fax: 1.303.939.8844 Spectra Logic Technical Support Technical Support Portal: support.spectralogic.com United States and Canada Europe, Middle East, Africa Phone: Phone: 44 (0) 870.112.2185 Toll free US and Canada: 1.800.227.4637 Deutsch Sprechende Kunden Phone: 49 (0) 6028.9796.507...
Introduction This guide provides instructions for replacing the LCD (operator panel) in the Spectra T200, T380, T680, T950, or TFinity library (referred to in these instructions as “the library”). The guide provides separate chapters for each type of library. Task Described beginning on... Before You Begin this page Replacing the T200, T380, or T680 LCD page 9 Replacing the T950 LCD page 21 Replacing the TFinity LCD page 37 EFORE EGIN For all of the libraries, make sure that you address the requirements in this section to prepare for the maintenance procedure. Any additional requirement that are specific to a particular library are described in the chapter for that library. Estimated Time to Complete Replacing the LCD requires 30 to 45 minutes. This time estimate includes the time required to calibrate the touch screen after the installation is complete. Ensure ESD Protection The repair environment for the library must be free of conditions that could cause electrostatic discharge (ESD). To protect the library from ESD, follow these procedures when repairing or testing the library: Place a static protection mat on the work surface used while removing and installing library components. Use a 1‐megohm resistor to ground ...
Before You Begin Gather Tools and Supplies You must have the following to complete this procedure: The following tools from the library tool kit: #2 Phillips screwdriver 5/16‐inch open end wrench or nut driver (T200, T380, T680 only) Small wire cutter (T950 and TFinity only) A new LCD assembly from Spectra Logic T200, T380, and T680 libraries: P/N 91019834 T950 and TFinity libraries: P/N 90949037 Note: The LCD panel assembly for the T200, T380, and T680 libraries is different from the one used for the T950 and TFinity libraries. Make sure that you have the correct assembly. Identify the FRU Kit Components Unpack and identify the components that shipped with the LCD FRU kit using the following table for reference. Keep the packaging to return the LCD panel you replaced to Note: Spectra Logic. Library Component # Provided Description T200 LCD panel assembly with power button ...
Prepare to Power Off the Library Prepare to Power Off the Library The library must be powered off during the replacement procedure. Therefore, backups cannot run during LCD replacement. Use the following steps to prepare the library for power down. 1. Use your backup software to stop any backups running to the library. 2. Use your backup software to move any cartridges that are currently in tape drives back their storage location. 3. If you cannot use your backup software, then move the cartridges using the BlueScale web interface as described in the User Guide for your library. 4. Using the BlueScale web interface, pause PostScan if it is running as described in the User Guide for your library. Any tapes currently being scanned are returned to their storage locations. 5. Power down the library as described in the chapter corresponding to your library. March 2015 Spectra Tape Series Libraries...
Page 8
Before You Begin LCD Replacement Instructions 90940065...
Replacing the T200, T380, or T680 LCD This chapter describes replacing the LCD in a Spectra T200, T380, or T680 library. The relative locations of the components and the procedures are Note: the same for all three libraries unless otherwise indicated. REPARE FOR THE EPLACEMENT Before beginning this replacement procedure, make sure that you address the requirements in Before You Begin on page 5 and then perform the steps in the following sections. Power Off the Library Prepare the library to be powered off, as described in Prepare to Power Off the Library on page 2. Power off the library from the front panel. Refer to the Spectra T200, T380 & T680 Libraries User Guide for Note: instructions if the BlueScale Soft Power option is enabled. a. Press the front panel power button for approximately six seconds or until the button’s LED starts flashing. b. Wait for power‐off sequence to complete. It takes from one minute to five minutes (depending on the library) while the library allows applications to shut down gracefully. 3. Make sure that the transporter is idle.
Replacing the T200, T380, or T680 LCD 4. Set the main power switches on the library back panel to the off position. Note: If you have redundant power supplies installed, make sure you turn off both power switches. Main AC Main AC switch switch Figure 1 Turn off library AC power switches. Remove the Front Panel 1. From the front of the library, pull firmly outward on the top edge of the filter cover panel to release the magnetic latches and tip the cover out from the front panel. Pull outward Lift upward Figure 2 Remove the filter cover panel.
Page 11
Prepare for the Replacement 4. Using your fingers or a #2 Phillips screwdriver, loosen, but do not remove, the two knurled screws securing the bottom of the library front panel to the chassis. Knurled screws Figure 3 Loosen the front panel screws. 5. Lift the front panel outward and away from the chassis to disengage the two nuts on the back of the front panel from the holes on either side of the chassis. Set the cover aside. Alignment nut on front panel Figure 4 Remove the front panel. March 2015 Spectra Tape Series Libraries...
Replacing the T200, T380, or T680 LCD LCD P EMOVE THE ANEL Follow these steps to remove the LCD panel from the library. 1. Detach the LCD panel assembly from the chassis. T380 and T680 a. Use a 5/16‐inch open end wrench or nut driver, remove the four Keps nuts that secure the LCD panel to the front of the chassis. b. Carefully lift the assembly off the threaded studs extending from the front of the chassis. Keps nut Keps nut (T380 and T680 only) (T380 and T680 only) Keps nut Keps nut Figure 5 Remove the Keps nuts that secure the LCD panel to the chassis.
Page 13
Remove the LCD Panel 2. Turn the assembly over so that you can access the printed circuit board on the back of the assembly. Front panel display cable connector Figure 6 Disconnect the front panel display cable from the printed circuit board. 3. Disconnect the front panel display cable from the printed circuit board. Set the LCD panel aside for return to Spectra Logic (see Return the Component on page 55). March 2015 Spectra Tape Series Libraries...
Replacing the T200, T380, or T680 LCD NSTALL THE Use the following steps to install the new LCD assembly. 1. Connect the front panel display cable to the connector on the printed circuit board mounted on the back of the LCD panel. Make sure the connector is fully seated. The connector is not keyed. Make sure that pin 1 on the connector is toward the left Caution and the raised ridge at the front of the connector is up. Note: Pin 1 is labeled on the connector.
Page 15
Keps nut Keps nut Figure 8 Mount the LCD panel assembly on the front of the T380 or T680 library. c. Using a 5/16‐inch open ended wrench or nut driver, install the four Keps nuts on the threaded studs to secure the LCD panel assembly to the chassis. Tighten the nuts securely. T200 a. Orient the LCD panel assembly so that the slots in the frame are toward the top and the front panel cable extends to the right, out from under the edge of the LCD panel frame. March 2015 Spectra Tape Series Libraries...
Page 16
Replacing the T200, T380, or T680 LCD b. Slide the slots in the top edge of the LCD panel frame under the nylock nuts, which are under the upper lip of the chassis. Fit cable through cut- Nylock nut Nylock nut out in edge of frame Figure 9 Mount the LCD panel assembly on the front of the T200 library. c. While holding the front panel display cable in the cut‐out, position the LCD panel assembly so that the holes in the bottom of the LCD panel frame fit over the threaded studs extending from the front of ...
Install the Front Panel 1. Grasp the left and right edges of the front panel and lift it into position on the front of the chassis. a. Align the openings for the touch screen and the TAP with the front of the library. b. Insert the alignment pin on the bottom edge of the front panel into the corresponding hole in the bottom edge of the chassis. c. Fit alignment pin on the top edge of the panel and the two nuts extending from the back of the front panel into the corresponding holes on the edges of the chassis. Note: Make sure that the power button fits into the cut‐out in the front panel and that the front panel is flush against the front of the chassis. Alignment nut on front panel Figure 10 Install the front panel on the chassis. March 2015 Spectra Tape Series Libraries...
Page 18
Replacing the T200, T380, or T680 LCD 2. Using your fingers or a #2 Phillips screwdriver, tighten the two knurled screws on the bottom of the library front cover to secure it to the chassis. Slot for Slot for filter cover filter cover Knurled screws Figure 11 Install the front panel screws. 3. Position the tabs on the back of the filter cover over the slots in the front cover (Figure 11). 4. Make sure that the air filter is positioned on the inside of the filter cover. 5. Engage the tabs with the slots in the front of the library, then slide the cover downward. Push the upper edge of the cover toward the front panel until the magnets secure it to the front panel. Push inward Slide downward Figure 12 Install the filter cover.
Calibrate the Touch Screen Note: Calibrating the touch screen also tests the LCD panel to ensure that it is working properly. 1. Log into the library with superuser or administrator privileges. 2. From the toolbar menu, select Maintenance > Tools to display the Maintenance Tools screen. 3. Select Utilities. The Utilities screen displays. 4. Select Calibrate Touch Screen. Note: This utility is not available if you are using the BlueScale web interface from a remote computer. You must be standing in front of the LCD in order to calibrate it. Figure 13 The Calibrate Touch Screen utility. March 2015 Spectra Tape Series Libraries...
Replacing the T200, T380, or T680 LCD 5. Select Run Utility. The touch screen displays a series of calibration target points. 6. Touch each point as it displays with either your finger or a stylus to recalibrate the touch points on the screen. Note: Touch each point at a straight‐on angle as close to the center of the target as possible. 7. When the calibration routine is complete, the Utilities screen redisplays. Restart Backups Use your backup software to restart any backup processes running on library. Return the Old LCD Assembly to Spectra Logic Refer to Return the Component on page 55 for instructions. LCD Replacement Instructions 90940065...
Replacing the T950 LCD This chapter describes replacing the LCD in the Spectra T950 library. REPARE FOR THE EPLACEMENT Before beginning this replacement procedure, make sure that you address the requirements in Before You Begin on page 5 and then perform the steps in the following sections. Power Off the Library Prepare the library to be powered off, as described in Prepare to Power Off the Library on page 2. Power off the library from the front panel. Note: Refer to the Spectra T950 Library User Guide for instructions if the BlueScale Soft Power option is enabled. a. Press the front panel power button for approximately six seconds or until the button’s LED starts flashing. b. Wait for power‐off sequence to complete. It takes from one minute to five minutes (depending on the library) while the library allows applications to shut down gracefully. 3. Make sure that the transporter is idle and does not contain a magazine. 4. Turn off the main power breakers on the back of the main frame. Notes: If you have redundant power supplies installed, make sure you turn off both breakers. It is not necessary to turn off the breaker switches on any drive expansion frames that are present.
Replacing the T950 LCD Remove the Cosmetic Cover Use the following steps to remove the cosmetic cover from the main drive frame. 1. Remove the filter cover by pulling outward on the handle at the top left of the panel (A) and the bottom right corner of the panel (B). Figure 15 The filter cover. 2. Using a #2 Phillips screwdriver, remove the two flathead screws that secure the lip on the bottom of the cosmetic cover to the chassis. Screws Figure 16 Remove the screw at the bottom of the side panel. LCD Replacement Instructions 90940065...
Page 23
Pull outward on the bottom edge of the cover. Figure 17 Pull the cover away from the Figure 18 Loosen the cover just up to ball studs. the level of the power button. March 2015 Spectra Tape Series Libraries...
Page 24
Replacing the T950 LCD c. From the left side of the cosmetic cover, reach behind the cover and locate the power switch connector. d. Press in on the connector release tab and disconnect the power cable from the power switch mounted on the back of the cosmetic cover. Connector (under cover plate on back of cosmetic cover) Viewed from back (protective cover removed) Figure 19 Remove the screws securing the power button mounting bracket to the LCD assembly. 4.
Remove the LCD Panel LCD P EMOVE THE ANEL Follow these steps to remove the LCD panel from the library. 1. Using your fingers or a #2 Phillips screwdriver, loosen but do not remove the two captive knurled screws that secure the hinged LCD panel closed. Knurled screws Figure 21 Loosen the knurled screws to open the hinged LCD panel. 2. Open the LCD panel, exposing the cables behind it. March 2015 Spectra Tape Series Libraries...
Page 26
Replacing the T950 LCD 3. Disconnect the front panel display cable from the printed circuit board on the back of the LCD panel. Note: If a cable tie secures the cable to the panel, use wire cutters to cut the tie. Be careful not to damage the cable. Front panel display cable Figure 22 Disconnect the front panel display cable from the LCD panel. 4. Position the cable in the opening behind the LCD panel so that it will not be pinched when you close the panel. 5. Close the LCD panel and use the two knurled thumb screws to secure it closed (see Figure 21 on page 25). LCD Replacement Instructions 90940065...
Figure 23 Remove the screws securing the LCD panel hinge to the chassis. 7. While supporting the panel, loosen the knurled screws and lift the LCD panel away from the chassis. Set the LCD panel aside for return to Spectra Logic (see Return the Component on page 55). NSTALL THE Use the steps in the following sections to install the new LCD assembly. Install the Snap Bushing Note: Your LCD FRU may already have the black snap bushing installed. If so, skip this section and proceed to Mount the LCD Panel on page 1. From the front of the LCD panel, position the black snap bushing, flat side toward the outside, over the circular hole in the LCD panel. 2. Press the bushing into the hole. March 2015 Spectra Tape Series Libraries...
Replacing the T950 LCD Mount the LCD Panel 1. Open the hinge along the left side of the LCD panel. Position the LCD panel over the opening as shown in Figure Knurled screws Screws Figure 24 Attach the LCD panel to the chassis. 3. Attach the LCD panel to the chassis. a. Align the holes in the hinge with the corresponding holes in the chassis. b. While holding the panel in place, temporarily secure the panel to the chassis by tightening the two knurled screws. c. Using a #2 Phillips screwdriver, install the screws you removed from the old LCD panel to secure the hinge to the chassis. Tighten the screws securely. LCD Replacement Instructions 90940065...
Install cable tie Route the power button cable through hole to the front Figure 25 Connect the T950 power cable to the LCD panel. b. Route the cable through the hole in the LCD panel, out to the front of the panel. c. Use a cable tie holder and cable tie to secure the power button cable to the back of the LCD panel as shown in Figure d. Adjust the position of the power button cable so that it will not be pinched by the LCD panel when you close it. March 2015 Spectra Tape Series Libraries...
Page 30
Replacing the T950 LCD 3. Connect the front panel display cable to the connector on the printed circuit board. a. Connect the front panel display cable to the connector on the printed circuit board mounted on the back of the LCD panel. Make sure the connector is fully seated. The connector is not keyed. Make sure that pin 1 on the connector is to the left and Caution the raised ridge at the front of the connector is up. Note: Pin 1 is labeled on the connector.
Page 31
Cable tie holder and cable tie Figure 27 Secure the power button cable to the front of the LCD panel. March 2015 Spectra Tape Series Libraries...
Replacing the T950 LCD OMPLETE THE EPLACEMENT After you finish installing the new LCD, follow the steps in this section to complete the procedure. Install the Front Panel 1. Using both hands, lift the cosmetic cover and align the openings with the LCD panel and the TAP. 2. Insert the tabs on the top edge of the cover into the slots in the top edge of the library chassis and then lower the cover into place over the LCD and the TAP. Leave the cover hanging freely from the top edge of the library. Do not press the Important cover into place yet. Insert the tabs on the top edge of the cover into the slots...
Page 33
Figure 29 Remove the screws securing the power button mounting bracket to the LCD assembly. 4. Let the cosmetic cover drop down into place and then push firmly inward along the length of the cover to snap the ball studs on the back of the cover into the snap‐in connectors on the front of the library. 5. Using a #2 Phillips screwdriver, install the two flathead screws that secure the lip on the bottom of the cosmetic cover to the chassis. Screws Figure 30 Remove the screw at the bottom of the side panel. 6. Orient the filter cover over the fan assembly and the push firmly inward on the sides of the cover to snap it into place. March 2015 Spectra Tape Series Libraries...
Replacing the T950 LCD Power On the Library 1. Set the AC power breakers on the main frame to the on position (see Figure 14 on page 21). 2. Press and hold the front panel power button for two to three seconds or until the button’s LED illuminates. 3. Wait while the library completes its power‐on sequence, which takes about five minutes (depending on the library configuration). During the power‐on sequence the library initializes all of its installed components. The library is ready to begin operation when the login screen displays on the front panel. Calibrate the Touch Screen Note: Calibrating the touch screen also tests the LCD panel to ensure that it is working properly. 1. Log into the library with superuser or administrator privileges. 2. From the toolbar menu, select Maintenance > Tools to display the Maintenance Tools screen. 3. Select Utilities. The Utilities screen displays. 4. Select Calibrate Touch Screen. This utility is not available if you are using the BlueScale web ...
Complete the Replacement 5. Select Run Utility. The touch screen displays a series of calibration target points. 6. Touch each point as it displays with either your finger or a stylus to recalibrate the touch points on the screen. Touch each point at a straight‐on angle as close to the center of Note: the target as possible. 7. When the calibration routine is complete, the Utilities screen redisplays. Restart Backups Use your backup software to restart any backup processes running on library. Return the Old LCD Assembly to Spectra Logic Refer to Return the Component on page 55 for instructions. March 2015 Spectra Tape Series Libraries...
Page 36
Replacing the T950 LCD LCD Replacement Instructions 90940065...
Replacing the TFinity LCD This chapter describes replacing the LCD in the Spectra TFinity library. REPARE FOR THE EPLACEMENT Before beginning this replacement procedure, make sure that you address the requirements in Before You Begin on page 5 and then perform the steps in the following sections. Power Off the Library Prepare the library to be powered off, as described in Prepare to Power Off the Library on page 2. Power off the library from the front panel. Note: Refer to the Spectra TFinity Library User Guide for instructions if the BlueScale Soft Power option is enabled. a. Press the front panel power button for approximately six seconds or until the button’s LED starts flashing. b. Wait for power‐off sequence to complete. It takes from one minute to five minutes (depending on the library) while the library allows applications to shut down gracefully. 3. Make sure that the transporter is idle and does not contain a magazine. 4. Turn off the main power breakers on the back of the main frame. Notes: If you have redundant power supplies installed, make sure you turn off both breakers. It is not necessary to turn off the breaker switches on any drive expansion frames that are present.
Page 38
Prepare for the Replacement Remove the Light Bar The light bar is located along the top front edge of each frame. You only need to remove the light bar from the main drive frame. 1. Using your fingers, lift upward on the left end of the light bar to disengage the ball stud on the back of the bar from the hole in the chassis. Caution The light bar is fragile. Handle it with care as you remove it. Ball stud Lift edge Figure 33 Remove the light bar. 2. Lift up on the other end of the light bar to disengage the ball stud on that end from the hole in the chassis.
Remove the Cosmetic Cover Remove the Cosmetic Cover Use the following steps to remove the cosmetic cover from the main drive frame. 1. Remove the fan filter cover by first pulling firmly outward on bottom center of the panel (A). Then pull pulling outward on the handle at the top center of the panel (B). Set the cover aside. Figure 34 Remove the fan filter cover. 2. Using a #2 Phillips screwdriver, remove the two flathead screws that secure the lip on the bottom of the cosmetic cover to the chassis. Screws Figure 35 Remove the screw at the bottom of the side panel. March 2015 Spectra Tape Series Libraries...
Page 40
Prepare for the Replacement 3. Remove the cosmetic cover from the front of the main frame. a. Pull outward on the bottom edge of the cosmetic cover so that you can slide your fingers under the edges of the cover as shown in Figure b. Use both hands to pull firmly outward on the cosmetic cover to disengage the four ball studs on the back of the cover from the panel behind it. Lift the cover up and off. Slide your fingers under the edges of the cover. Pull outward on the bottom edge of the cover. Figure 36 Pull the cover away from the Figure 37 Lift the cover up and off the ball studs.
Figure 38 Remove the screws securing the power button mounting bracket to the LCD assembly. 2. While using your thumbnail to pull slightly outward on the back of the power button housing to disengage it from the back of the mounting bracket, slide housing to the left so that the tabs on the front housing align with the cut‐outs in the mounting bracket. Tabs Figure 39 Remove the mounting bracket from the power button cable. 3. Disengage the switch from the mounting bracket. March 2015 Spectra Tape Series Libraries...
Page 42
Remove the LCD Panel 4. Push the cable through the hole in the panel into the open space behind the panel. 5. Using your fingers or a #2 Phillips screwdriver, loosen but do not remove the two captive knurled screws that secure the hinged LCD panel closed. Knurled screws Figure 40 Loosen the knurled screws to open the hinged LCD panel. 6. Open the LCD panel, exposing the cables behind it. LCD Replacement Instructions 90940065...
Page 43
Power button cable connector Front panel display cable connector Figure 41 Disconnect the power button cable and front panel display cable from the LCD panel. 8. Position both cables in the opening behind the LCD panel so that they will not be pinched when you close the LCD panel. 9. Close the LCD panel and tighten the two knurled thumb screws to secure it closed (see Figure 40 on page 42). March 2015 Spectra Tape Series Libraries...
Page 44
Remove the LCD Panel 10. Using a #2 Phillips screwdriver, remove the six screws that secure the hinge on the left side of the LCD panel to the chassis. Set the screws aside; you will use them to install the new LCD panel. Screws (6) Figure 42 Remove the six screws securing the LCD panel hinge to the chassis. 11. While supporting the panel, loosen the knurled screws and lift the LCD panel away from the chassis. Set the LCD panel aside for return to Spectra Logic (see Return the Component on page 55). LCD Replacement Instructions 90940065...
Use the steps in the following sections to install the new LCD assembly. Note: Your LCD FRU may have the T950 power cable connected to the LCD panel instead of loose in the kit. If the cable is connected, remove it. Disconnect T950 power button cable Cut cable tie Pull the power button cable through hole and remove it Figure 43 Remove the T950 power cable from the LCD panel. March 2015 Spectra Tape Series Libraries...
Install the New LCD Panel Mount the LCD Panel 1. Open the hinge along the left side of the new LCD panel. Position the LCD panel over the opening as shown in Attach the LCD panel to the chassis. Knurled screws Screws (6) Figure 44 Attach the LCD panel to the chassis. 3. Attach the LCD panel to the chassis. a. Align the holes in the hinge with the corresponding holes in the chassis. b. While holding the panel in place, temporarily secure the panel to the chassis by tightening the two knurled screws. c. Using a #2 Phillips screwdriver, install the six screws you removed from the old LCD panel to secure the hinge to the chassis. Tighten the screws securely. LCD Replacement Instructions 90940065...
Pin 1 Ridge Feed power button through hole Figure 45 Connect the power button cable and front panel display cable to the printed circuit board. 3. Insert the power button through the hole closest to the hinge, out to the front of the panel. 4. Use a cable tie holders and cable ties to secure the power button cable and the front panel cable to the back of the LCD panel. 5. Adjust the position of the front panel cable and the power cable so that they will not be pinched by the LCD panel when you close it. March 2015 Spectra Tape Series Libraries...
Page 48
Install the New LCD Panel 6. Close the LCD panel and tighten the knurled screws to secure it in place. Make sure that you do not pinch the power cable between the LCD panel and the Caution chassis. Knurled screws Figure 46 Tighten the knurled screws secure the LCD panel closed. 7. Orient the power button mounting bracket so that the raised center portion is away from the library and the notches in the opening are ...
Page 49
Make sure that the power button and the mounting plate have some freedom to Important move after they are secured to the LCD panel. This will allow the button to “float” into place when the cosmetic cover is installed. March 2015 Spectra Tape Series Libraries...
Complete the Replacement OMPLETE THE EPLACEMENT After you finish installing the new LCD panel, use the steps in the following sections to complete the replacement process. Install the Cosmetic Cover Use the following steps to install the cosmetic cover. 1. Orient the cosmetic cover so that the sensor switch on the front of the library aligns with the opening in the back of the cover. Tabs on Slots for cover cover Sensor switch Sensor opening switch Snap-in Ball studs connectors Figure 48 Position the cosmetic cover over the front of the library. LCD Replacement Instructions 90940065...
Page 51
Figure 49 Mount the cosmetic cover on the front of the library. 4. Guide the hole in the back of the cover over the sensor switch on the front of the library and then lower the cover into place over the LCD and the TAP. 5. Push firmly inward along the length of the cosmetic cover to snap the four ball studs on the back of the cover into the snap‐in connectors on the front of the library. March 2015 Spectra Tape Series Libraries...
Complete the Replacement 6. Using a #2 Phillips screwdriver, install the two flathead screws that secure the bottom of the cover to the chassis. Screws Figure 50 Remove the screw at the bottom of the side panel. 7. Orient the filter cover over the fan assembly and the push firmly inward on the sides of the cover to snap it into place. Install the Light Bar 1. Orient the light bar with the curved edge toward the front of the library. Caution The light bar is fragile. Handle it with care as you install it. 2.
Calibrate the Touch Screen Note: Calibrating the touch screen also tests the LCD panel to ensure that it is working properly. 1. Log into the library with superuser or administrator privileges. 2. From the toolbar menu, select Maintenance > Tools to display the Maintenance Tools screen. 3. Select Utilities. The Utilities screen displays. 4. Select Calibrate Touch Screen. Note: This utility is not available if you are using the BlueScale web interface from a remote computer. You must be standing in front of the LCD in order to calibrate it. Figure 52 The Calibrate Touch Screen utility. 5. Select Run Utility. The touch screen displays a series of calibration target points. March 2015 Spectra Tape Series Libraries...
Complete the Replacement 6. Touch each point as it displays with a stylus to recalibrate the touch points on the screen. Note: Touch each point at a straight‐on angle as close to the center of the target as possible. 7. When the calibration routine is complete, the Utilities screen redisplays. Restart Backups Use your backup software to restart any backup processes running on library. Return the Old LCD Assembly to Spectra Logic Refer to Return the Component on page 55 for instructions. LCD Replacement Instructions 90940065...
Return the Component After you complete the replacement procedure, use the information in this section when returning the defective component to Spectra Logic. Return Guidelines Unless Spectra Logic Technical Support informs you otherwise, return the defective component to Spectra Logic as described in the following section. If Spectra Logic Technical Support informs you that the component does not need to be returned, dispose of it in the manner appropriate for your company guidelines Return Procedure Pack the defective component using ALL the packaging that the replacement part arrived in (including any anti‐static bags or foam inserts). Severe damage can occur if the component is not packaged correctly, and you may Caution be invoiced if it is received with damage due to improper or insufficient packaging. Use the return label and instructions that were included with the ...