Download Print this page

Plymouth Valiant V-100 1965 Service – Technical Manual page 74

Advertisement

3-4
REAR AXLE
using Tool C-637 (Fig. 6 ) . Reinstall the seal using Tool
C-839 (Fig. 7 ) .
Disussembly
collar (Fig. 8 ) .
lower edge with a chisel (Fig. 9 ) .
(1) Install the axle shaft in a vise and notch the
(2) Remove the roller retainer by cutting it off the
CAUTION: To
prevent the possibility of nicking
the shaft during the grinding operation slide pro-
tective sleeve
SP5041
over the sealing surface
of
the axle shaft and next to the bearing.
(3) Grind a section off the flange of the inner bear-
ing cone (Fig. 10).
(4) Remove the bearing rollers from the section of
the flange that was ground away (Fig. 1 1 ) .
(5)
Pull the roller retainer down as far as possible
and cut it with a pair of side cutters and remove from
the assembly (Fig. 12).
(6) Remove roller bearing cup from axle shaft.
(7) Using Tool C-3971, remove the bearing cone.
Tighten the bolts alternately until the cone is
re-
moved (Fig. 13).
(8)
Replace the seal in the retainer plate.
BEARING
I
ROLLER
Fig.
1 1
-Removing
the Bearing Rollers
SLEEVE
l ; l p I L , = 7 1 )
Fig. 12-Cutting
Out the Roller Bearing Retainer
f i g . 9-Removing
the Roller Retainer
Fig. 1 0-Flange
Ground Off the Inner Cone
361
Fig. 13-Removing
the Bearing Cone with Tool C-3971
I C
Assembly
(1) Install the retainer plate on the axle shaft.
(2) Install a new bearing cone and cup and
collar
(3) Tighten the long bolts alternately until the
using Tool C-3971 (Fig. 14).
bearing and collar are installed.

Hide quick links:

Advertisement

loading